(504) 576-9561
Free Estimate!
Paver hopper discharging fresh asphalt onto a prepared roadbed

New Orleans metro

Asphalt Paving in New Orleans, LA

Tell us the surface and the square footage and the job gets priced properly instead of guessed at. We are fully licensed, bonded, and insured.

Asphalt Paving

What Does Asphalt Paving Mean, and How Is It Different From Installation?

Asphalt paving is the laying and compacting of the asphalt mat itself, whether that is over a base we have just built or over a surface that is sound enough to keep. Installation is the whole job from bare ground up; paving is the layer that carries the traffic. Which one you need depends on what is already there.

A paving train laying asphalt along a road behind a delivery truck

Three situations come up most often:

A roller drum pressing down a fresh asphalt mat

Nothing there yet.

That is a full asphalt installation, with ground work and a base before any paving happens

A rake lifting fresh hot asphalt on a new surface

An old surface that is still structurally sound.

A new layer can go over it, which is quicker and costs less than starting again

The edge of a new asphalt mat meeting the gravel verge

An old surface that has failed underneath.

Paving over that buys very little, and replacing it is the honest answer

Asphalt Paving

How Do We Lay an Asphalt Surface?

We lay a surface in three moves: prepare and clean what the mat will sit on, place the asphalt at the specified depth, then compact it while it is hot. The third one has a time limit, which is why a paving crew works at the pace it does.

A roller compacting a fresh asphalt surface while it is still hot

Painted lane lines running along a finished asphalt surface

We Prepare What the Mat Sits On

A base is compacted and leveled, or an existing surface is cleaned and its failures dealt with. Anything left loose underneath will show through the new layer.

Fresh white markings and traffic cones on a newly finished surface

We Place the Mat at the Right Depth

Depth follows the traffic the surface actually carries, not a single figure applied to every job. A car driveway and a lot taking loaded delivery vehicles are not paved the same way.

A crew raking hot asphalt into a patched area

We Compact While It Is Still Hot

Compaction is only available while the material is hot, and it is what turns loose mix into a surface that sheds water. Joints and edges are worked last so there is no open seam for water to enter.

Asphalt Paving

Which Asphalt Mix Is Right for Your Surface?

The right mix follows the use, the traffic and the season, and choosing it is our job rather than yours. What matters to you is that the surface is specified for the load it will carry, because a mix chosen for a quiet driveway can deform under vehicles it was never meant to hold.

Crew spreading and levelling hot asphalt across a prepared area

What we take into account:

Our asphalt repair page sets out what happens when a surface carries more than it was built for.

Asphalt broken into plates by cracking

What crosses it.

Cars, delivery vehicles, or plant and trailers

A wide area of pavement cracked into a close pattern

Whether loads sit still.

Standing weight deforms a surface more readily than moving weight

A crew raking hot asphalt level against a finished edge

Drainage.

A surface that holds water is treated differently from one that sheds it

A close view of loose hot asphalt before it is compacted

When we are laying.

Ambient conditions change the working window on site

Asphalt Paving

How Soon Can You Drive on a New Asphalt Surface?

A new surface has to cool before it takes traffic, and the honest answer is that it depends on depth, on the weather at the time and on what will be driving over it. We tell you on site what your surface needs and when it can be used, and we would rather give you a date that holds than a fast one that marks the mat.

A Fresh Mat Marks Easily

Marking a fresh surface is easy to do and hard to undo, so the wait matters more than it looks. Turning wheels on a mat that has not finished cooling leaves scuffs that stay.

Which Parts Go Out of Use

We tell you which parts of the area are unusable and on which days, before the crew arrives rather than on the morning it happens.

What Has to Be Moved, and By When

Anything standing on the surface has to be off it before we start. You get that list, with the deadline, in writing with the estimate.

Asphalt Paving

What Moves the Price of Asphalt Paving?

The price moves with the measured area, the depth the use calls for, the condition of what the mat will sit on, access for our equipment, and how much of the surface can close at once. We do not publish a price per square foot, because the same square foot costs different amounts depending on what has to happen beneath it.

The Measured Area

The area is measured on your surface rather than taken from a map or a photograph, so the figure you are quoted is the one we will actually pave.

The Depth the Use Calls For

Depth follows the traffic the surface carries. A car driveway and a lot taking loaded delivery vehicles are not paved to the same specification.

What the Mat Will Sit On

An existing surface changes the job more than anything else does. Paving over sound asphalt and building up from ground that has to be dug out first are different pieces of work, and only one of them can be judged from a photograph.

Access and How Much Can Close

How our equipment reaches the surface, and how much of it can go out of use at once, both move the schedule. You get the whole thing in writing before anything starts, at no cost.

Asphalt Paving

What Keeps a New Surface in Good Condition?

Three habits do most of the work, and none of them costs much next to the repair it prevents. Our asphalt maintenance page covers the routine, and seal coating covers the protective coat itself.

Keep Water Moving Off the Surface

Water that cannot leave sits at the low point, works into the base and takes its strength away. Keeping the drainage lines and the low spots clear is what stops that starting.

Deal With a Crack While It Is One Line

A single crack is a sealing job. The same crack after a season of Gulf Coast rain has branched and reached the base, and by then it is a patch or a repair.

Seal When the Surface Is Ready

Sealing follows the condition of the mat rather than a fixed calendar. We tell you when yours is ready instead of booking it to a date that suits a schedule.

Asphalt Paving

Where Do We Pave?

We pave across the New Orleans metro, and each area we cover has a page of its own with the local detail on it. If your property sits on the edge of these areas, call us and we will tell you plainly whether it is in range.

Greater New Orleans

New Orleans, Metairie, Kenner, Gretna, Harahan and River Ridge, across Orleans and Jefferson Parish.

The Northshore

Slidell, Covington, Mandeville and Madisonville, across St. Tammany Parish.

The River Parishes and Baton Rouge

St. Rose, LaPlace, Hammond and Baton Rouge, across St. Charles, St. John the Baptist, Tangipahoa and East Baton Rouge Parish.

Standards

What Do the Asphalt Specifications Actually Say?

Two claims repeated across the paving trade do not survive a reading of the source documents.

A Minutes, not days

Asphalt does not have a cure time. It gains full strength on cooling and can typically support traffic within minutes of construction, and hours only in rare cases depending on lift thickness and ambient conditions. A newly built two inch surface is generally a few minutes.

B A few days is advice

The association guidance still recommends waiting a few days before opening a new residential driveway, and keeping a heavy moving truck off a fresh mat. That is best practice advice about protecting a new surface, not a curing requirement.

C No single minimum temperature

The minimum is set by lift thickness and mix type in the governing specification. Colorado DOT Table 401-3 sets 60 F for a top layer under 1.5 inches, 50 F from 1.5 to under 3 inches, and 45 F at 3 inches or more. Tennessee DOT Table 407.09-1 as revised 12-27-23 sets 45 F unmodified and 55 F modified under 2.0 inches, and 35 F at 2.0 inches or more. Neither of those is Louisiana's specification.

D Do not seal a new mat early

A well designed low traffic pavement should not require sealing for approximately 2 to 5 years, and the association guidance is not to apply sealer until the driveway is at least several months old.

Not claimed here: 3 to 7 days before traffic

Widely repeated, but every page carrying it was a paving company's own marketing or a content site, and the Asphalt Institute contradicts the framing outright. It does not appear on this page.

Not claimed here: 50 F is the minimum

Repeated as a flat rule. The two state specifications read in full show the minimum is thickness and mix dependent, and those two specifications do not even agree with each other.

Common questions

What Do People Ask About Asphalt Paving?

How Long Does Asphalt Paving Take?

It depends on the measured area, the depth your use calls for, and how much of the surface can close at once. A driveway and a phased parking lot are different pieces of work. You get the working dates in writing before anything starts, so you know which days the area is out of use.

How Long Does an Asphalt Driveway Last in Louisiana?

Lifespan on this coast is set by heat, water and what sits on the surface. New Orleans records about 85 days a year at 90 degrees or above and more than 63 inches of rain, and both of those age a mat. Drainage and dealing with a crack early extend it more than anything else.

Can You Pave Over an Existing Asphalt Driveway?

Only when what is underneath is still structurally sound. A new layer over solid asphalt is quicker and costs less than starting again. Where the base has failed, an overlay buys very little and replacing the surface is the honest answer. We tell you which of the two you are looking at on site.

How Thick Should an Asphalt Driveway Be?

Depth follows the traffic the surface actually carries, not a single figure applied to every job. A car driveway and a lot taking loaded delivery vehicles are not paved the same way. We specify the depth from your own surface and its use, and it is set out in the written estimate.

Is Asphalt Cheaper Than Concrete for a Driveway?

Asphalt usually costs less to install and is quicker to lay, and a worn surface can often be resurfaced rather than replaced. Concrete tends to last longer before major work is needed. Which one suits you depends on the load the surface carries, the drainage, and how long you plan to hold the property.

What Is the Best Time of Year to Pave in New Orleans?

Ambient conditions change the working window on site, and rain matters more here than cold does. Paving is workable across most of the year on this coast, with the schedule built around wet weather rather than around frost. We confirm the window for your surface when we assess the site.

Do You Need a Permit to Pave a Driveway in New Orleans?

It varies by parish and by what the work involves. A new surface inside private property is treated differently from anything that touches the public right of way. We confirm what your job needs with the relevant authority before the crew arrives, and we tell you what applies before work starts.

How Soon Should a New Asphalt Surface Be Sealed?

A new surface is sealed when it is ready rather than on a fixed calendar, once the mat has had time to take the coat. Sealing too early traps what still needs to leave the surface. Our seal coating page covers the protective coat itself and when it is worth applying.

Ready for a Free Asphalt Paving Estimate in New Orleans?

Tell us the surface and the square footage, and the job gets priced properly instead of guessed at.

Driveways

Residential drives across the New Orleans metro, measured and quoted on the surface you actually have.

Parking lots

Commercial lots, surfaced and graded so water leaves them, then kept that way.

Every area we cover

Each area has its own page, written from its own facts. The service areas page goes straight to any of them.

Get a Free Estimate

Tell us about the driveway or the lot. We reply during business hours, Monday to Friday.

Form not loading for you? The number works just as well: (504) 576-9561, Monday to Friday, 8 AM to 5 PM.